
Stage two
All concrete work
Formed, tied and poured on site. House pads, shop slabs, driveways and approaches, sidewalks and patios. Old concrete broken out and hauled off before the new pour goes down. This is the category the 2024 reader’s poll was won in.
- Slabs and pads
- Driveways
- Sidewalks
- Approaches
- Tear out and replace






